72,713 mi
|
Market Price |
|
|
Aaron Difference |
-$11,137 |
|
Aaron Sale Price |
$54,371 |
Condition:
VIN:
Trim:
Stock #:
Color:
Used
WBS33AZ05MCH16762
Competition
206023P
Gray Metallic
Navigation System
Parking Assistance Package
16 Speakers
AM/FM radio: SiriusXM with 360L
harman/kardon Surround Sound System
harman/kardon® Speakers
Radio data system
Radio: AM/FM Audio System
SiriusXM Satellite Radio
Air Conditioning
Automatic temperature control
Front dual zone A/C
Rear air conditioning
Rear window defroster
Lumbar Support
Memory seat
Power driver seat
Power steering
Power windows
Remote keyless entry
Steering wheel mounted audio controls
Adaptive suspension
Four wheel independent suspension
Speed-sensing steering
Traction control
4-Wheel Disc Brakes
ABS brakes
Dual front impact airbags
Dual front side impact airbags
Emergency communication system: BMW Assist eCall
Front anti-roll bar
Knee airbag
Low tire pressure warning
Occupant sensing airbag
Overhead airbag
Rear anti-roll bar
Brake assist
Electronic Stability Control
Exterior Parking Camera Rear
Auto High-beam Headlights
Delay-off headlights
Fully automatic headlights
Panic alarm
Security system
Speed control
Auto-dimming door mirrors
Bumpers: body-color
Heated door mirrors
Parking Assistant Plus
Power door mirrors
Spoiler
Turn signal indicator mirrors
Auto-dimming Rear-View mirror
BMW Assist eCall
BMW TeleServices
Compass
ConnectedDrive Services
Drive Recorder
Driver door bin
Driver vanity mirror
Front reading lights
Garage door transmitter
Illuminated entry
Leather Shift Knob
Live Cockpit Pro w/Navi
Outside temperature display
Overhead console
Passenger vanity mirror
Rear reading lights
Rear seat center armrest
Sport steering wheel
Tachometer
Telescoping steering wheel
Tilt steering wheel
Trip computer
Extended Merino Leather Upholstery
Front Bucket Seats
Front Center Armrest
Heated Front Seats
Heated front seats
M Sport Seats
Power Front Seats
Power passenger seat
Split folding rear seat
Passenger door bin
Alloy wheels
Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Orbit Grey
Rain sensing wipers
Speed-Sensitive Wipers
Variably intermittent wipers
The Price you See is the Price you pay !!! No Games no Forced extras. Transparency is key , come see us for your next car.This 2021 BMW M4 Competition in Brooklyn Grey Metallic delivers impressive performance with a 3.0L turbocharged inline-six engine producing 503 horsepower. The eight-speed automatic Steptronic transmission and rear-wheel drive provide responsive handling and driving engagement. With its aggressive styling, premium appointments, and track-ready capability, this M4 Competition stands out as a serious driver's car.Key Features:- Parking Assistant Plus with Drive Recorder- Navigation System with Live Cockpit Pro- Harman/Kardon premium surround sound- M Sport Seats with extended Merino leather upholstery- Heated front seats with power adjustment- 19" x 9.5" front / 20" x 10.5" rear Orbit Grey wheels- Adaptive suspension with four-wheel independent setup- BMW Assist eCall emergency communication- Auto-dimming Rear-View mirror- Speed-sensitive steering and adaptive headlightsThe M4 Competition combines luxury and performance seamlessly. Its meticulously designed interior features premium leather seating, advanced infotainment, satellite radio, and comprehensive connectivity through BMW's ConnectedDrive Services. Multiple airbags, electronic stability control, rear parking camera, and emergency braking assist ensure safety throughout your drive.Visit us today to experience the precision engineering and exhilarating performance of this BMW M4 Competition firsthand.
Please contact us for more details
Although every reasonable effort has been made to ensure the accuracy of the information contained on this site, absolute accuracy cannot be guaranteed. The Dealership is not responsible for any unintended typographical, pricing, product specification, advertising, shipping or other errors. Advertised prices and availability are subject to change without notice. All vehicles are subject to prior sale. Vehicle sale prices include a factory rebate, if applicable, and are valid on cash or finance purchases only by an individual for their personal use. The sale price does not apply to a lease. All pricing and advertised prices for any/all vehicles offered for sale does not include dealer installed accessories which can be purchased for an additional cost. The factory rebate(s) may not be available if you elect to take advantage of a special alternative APR or special lease program. Some factory rebates are California resident specific and may vary for residents of other states. NO sales to Dealers, brokers, or exporters. For out of state purchases, customer must be present to purchase. If shipping is required, Dealership must facilitate - no exceptions. Please contact us for special multi-vehicle or fleet pricing. Prices plus government fees and taxes, any finance charges, any dealer document processing charge, any electronic filing charge, and any emission testing charged.
Sales: (951) 271-4741
Service: (951) 271-4743
Body Style: Coupe
Model Code: M4
Engine: 6Cyl
Transmission: 8-Speed Automatic Steptronic
Drive Type: RWD
Ext. Color: Gray Metallic
Int. Color: Black
MPG: 23
VIN #: WBS33AZ05MCH16762
Stock #: 206023P
|
Market Price |
|
|
Aaron Difference |
-$11,137 |
|
Aaron Sale Price |
$54,371 |
Navigation System
Parking Assistance Package
16 Speakers
AM/FM radio: SiriusXM with 360L
harman/kardon Surround Sound System
harman/kardon® Speakers
Radio data system
Radio: AM/FM Audio System
SiriusXM Satellite Radio
Air Conditioning
Automatic temperature control
Front dual zone A/C
Rear air conditioning
Rear window defroster
Lumbar Support
Memory seat
Power driver seat
Power steering
Power windows
Remote keyless entry
Steering wheel mounted audio controls
Adaptive suspension
Four wheel independent suspension
Speed-sensing steering
Traction control
4-Wheel Disc Brakes
ABS brakes
Dual front impact airbags
Dual front side impact airbags
Emergency communication system: BMW Assist eCall
Front anti-roll bar
Knee airbag
Low tire pressure warning
Occupant sensing airbag
Overhead airbag
Rear anti-roll bar
Brake assist
Electronic Stability Control
Exterior Parking Camera Rear
Auto High-beam Headlights
Delay-off headlights
Fully automatic headlights
Panic alarm
Security system
Speed control
Auto-dimming door mirrors
Bumpers: body-color
Heated door mirrors
Parking Assistant Plus
Power door mirrors
Spoiler
Turn signal indicator mirrors
Auto-dimming Rear-View mirror
BMW Assist eCall
BMW TeleServices
Compass
ConnectedDrive Services
Drive Recorder
Driver door bin
Driver vanity mirror
Front reading lights
Garage door transmitter
Illuminated entry
Leather Shift Knob
Live Cockpit Pro w/Navi
Outside temperature display
Overhead console
Passenger vanity mirror
Rear reading lights
Rear seat center armrest
Sport steering wheel
Tachometer
Telescoping steering wheel
Tilt steering wheel
Trip computer
Extended Merino Leather Upholstery
Front Bucket Seats
Front Center Armrest
Heated Front Seats
Heated front seats
M Sport Seats
Power Front Seats
Power passenger seat
Split folding rear seat
Passenger door bin
Alloy wheels
Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Orbit Grey
Rain sensing wipers
Speed-Sensitive Wipers
Variably intermittent wipers
The Price you See is the Price you pay !!! No Games no Forced extras. Transparency is key , come see us for your next car.This 2021 BMW M4 Competition in Brooklyn Grey Metallic delivers impressive performance with a 3.0L turbocharged inline-six engine producing 503 horsepower. The eight-speed automatic Steptronic transmission and rear-wheel drive provide responsive handling and driving engagement. With its aggressive styling, premium appointments, and track-ready capability, this M4 Competition stands out as a serious driver's car.Key Features:- Parking Assistant Plus with Drive Recorder- Navigation System with Live Cockpit Pro- Harman/Kardon premium surround sound- M Sport Seats with extended Merino leather upholstery- Heated front seats with power adjustment- 19" x 9.5" front / 20" x 10.5" rear Orbit Grey wheels- Adaptive suspension with four-wheel independent setup- BMW Assist eCall emergency communication- Auto-dimming Rear-View mirror- Speed-sensitive steering and adaptive headlightsThe M4 Competition combines luxury and performance seamlessly. Its meticulously designed interior features premium leather seating, advanced infotainment, satellite radio, and comprehensive connectivity through BMW's ConnectedDrive Services. Multiple airbags, electronic stability control, rear parking camera, and emergency braking assist ensure safety throughout your drive.Visit us today to experience the precision engineering and exhilarating performance of this BMW M4 Competition firsthand.